CC&R ARTICLE D: Landscaping
|
Section 1. Initial Landscaping. Prior to occupancy of any residential building on a Lot, the front yard of the Lot shall be landscaped and within 120 days after occupancy of the residential building on the Lot, the remainder of the Lot shall be landscaped: provided that if weather conditions or ground conditions due to weather are such that it is not reasonable to landscape the Lot within the time provided, the time for completion of the landscaping shall be extended for a period of thirty days after weather conditions and ground conditions due to weather are reasonable for landscaping. Any dispute over the time when weather or ground conditions due to weather are reasonable for landscaping may be determined by the Committee which determination shall be binding upon all interested parties.
Section 2. Landscape Maintenance. The owners of each Lot shall maintain the landscaping on the Lot in a neat and presentable condition at all times and shall not permit the Lot to become overgrown or allow weeds and other noxious plants to proliferate on the Lot. The obligation to maintain landscaping shall extend into the public right of way along each Lot which has been or is required to have been landscaped to the sidewalk or street curb in front of and side of the Lot, as applicable.
|